產(chǎn)品展示
聯(lián)系我們
聯(lián)系人:麥女士
手機(jī):+86 15270269218
電話:
Q Q:3136378118
郵箱:stodcdcs@gmail.com
地址:江西省九江市瑞昌市東益路23號賽湖農(nóng)商城401號
MVME297-256
簡介本章提供嵌入式控制器的開箱說明、硬件準(zhǔn)備指南和安裝說明。MVME712系列過渡模塊的硬件準(zhǔn)備在單獨(dú)的手冊中描述;請參閱1章中的相關(guān)文檔部分。開箱說明注意:如果裝運(yùn)紙箱在收到后受損,請要求承運(yùn)人代理人在開箱和檢查設(shè)備時在場。將設(shè)備從裝運(yùn)箱中取出。參考裝箱單,確認(rèn)所有物品均已存在。保存包裝材料,以便設(shè)備儲存和重新裝運(yùn)。注意避免接觸集成電路區(qū)域;靜電放電會損壞電路。硬件準(zhǔn)備為了生成所需的配置并確保的正確操作,您可能需要在安裝模塊之前進(jìn)行某些修改。提供對大多數(shù)選項的軟件控制:在系統(tǒng)中安裝后,通過在控制寄存器中設(shè)置位,可以修改其配置。(寄存器在4章中有描述,和/或在1章相關(guān)文檔中列出的嵌入式控制器程序員參考指南中有描述。)然而,有些選項不是軟件可編程的。此類選項通過手動安裝或拆除收割臺跳線或接口模塊進(jìn)行控制。



Introduction This chapter provides unpacking instructions, hardware preparation guidelines, and installation instructions for the Embedded Controller. Hardware preparation for the MVME712 series transition modules is described in separate manuals; refer to the Related Documentation section in Chapter 1. Unpacking Instructions Note If the shipping carton is damaged upon receipt, request that the carrier’s agent be present during the unpacking and inspection of the equipment. Unpack the equipment from the shipping carton. Refer to the packing list and verify that all items are present. Save the packing material for storing and reshipping of equipment. Caution Avoid touching areas of integrated circuitry; static discharge can damage circuits. Hardware Preparation To produce the desired configuration and ensure proper operation of the , you may need to carry out certain modifications before installing the module. The provides software control over most options: by setting bits in control registers after installing the in a system, you can modify its configuration. (The registers are described in Chapter 4, and/or in the Embedded Controller Programmer’s Reference Guide as listed in Related Documentation in Chapter 1.) Some options, however, are not software-programmable. Such options are controlled by manual installation or removal of header jumpers or interface modules.
相關(guān)產(chǎn)品